CDI FURLER

Nedstat Counter





I used one long line for the Jib Sheets with a cow hitch at the Genoa clew so there are no stubs to catch on the shrouds. The Sheets are run outside the shrouds.



Boom Vang and Reefing Line




The new Jib Sheet going to a block on the cockpit rail (modified Johnson p/n272435 by replacing bullseye with Ronstan Pulley block - can slide fore and aft with s/s hose clamp), forward to a block in the shroud pad-eye back to the original cam-cleat
Beckson DP60 BW Deck Plate with Storage bag (opened). The other 4" Deckplate in the seat wall has Battery terminals for the MinnKota connected on the inside to #4 wires going to 2 #31 AGM batteries .(See Batteries Setup)



HANGING OUT IN THE GARAGE



I used 1-ton automotive power pullers ($20 from JC Whitney) and 15' winch straps + I can also rest the boat on 3 small jack stands. (I strap the 2 lifting straps together under the boat so they dont slip)








Return Home
OR TO
Let's Potter
OR TO
Nav Lights
OR TO
Let's Go Sailing
OR TO
Down on the Chesapeake
OR TO
Fun Encounters

Send Comments to: Lionel L. Galibert = llgalib@optonline.net