CDI FURLER
I used one long line for the Jib Sheets with a cow hitch at the Genoa clew so there are no stubs to catch on the shrouds. The Sheets are run outside the shrouds. |
Boom Vang and Reefing Line
|
---|
The new Jib Sheet going to a block on the cockpit rail (modified Johnson p/n272435 by replacing bullseye with Ronstan Pulley block - can slide fore and aft with s/s hose clamp), forward to a block in the shroud pad-eye back to the original cam-cleat |
Beckson DP60 BW Deck Plate with Storage bag (opened). The other 4" Deckplate in the seat wall has Battery terminals for the MinnKota connected on the inside to #4 wires going to 2 #31 AGM batteries .(See Batteries Setup)
|
HANGING OUT IN THE GARAGE
I used 1-ton automotive power pullers ($20 from JC Whitney) and 15' winch straps
+ I can also rest the boat on 3 small jack stands. (I strap the 2 lifting straps
together under the boat so they dont slip) |
Send Comments to: Lionel L. Galibert =
llgalib@optonline.net